Aviation:
Dallas/Fort Worth International Airport, Dallas, Texas
Organizational Modeling, High Performance Contracting including Emergency and Safety Departments
Commercial & Corporate:
AHA Consulting Engineers, Inc., Lexington, MA
Air Sealing Design Review, Construction Monitoring and Testing for LEED Prerequisite
American Red Cross, VA
Organizational Modeling and CMMS Support
Boston Properties, Boston, MA
Identification of Air Leakage Pathway
Brunswick Corporation, Muskegon, MI
High level job analysis supporting plant relocation
The Coca-Cola Company, Atlanta, GA
Curriculum design and development
EGA Architects, Newburyport, MA
Assessment of Air Barrier Effectiveness
Ellerbe Becket, New York, NY
Quality Control Procedures
Hewlett Packard, Andover, MA
Computerized Maintenance Management Implementation; Training and Standardization Modeling
Jones, Lang and LaSalle, Boston, MA
Air Sealing Design Review, Construction Monitoring and Testing for LEED Prerequisite
MacRitchie Engineering, Inc.
Braintree, MA
Assessment of pressure relationships and infiltration of soil gases
MAW Consulting, Hanover, MA
Assessment of Air Barrier Effectiveness
Newman Architects, LLC
New Haven, CT
Policies and Procedures implementation
Staffing Projection Systems
Prellwitz Chilinski Associates Cambridge, MA
Assessment of Air Quality in Basement Garage
Safdoc Systems, LLC, Stoughton, MA
Assessment of Air Leakage Pathways
Target Corporation, Minneapolis, MN
Process documentation and training curriculum development for DC Operations
Tighe and Bond, Southampton, MA
Identification of Air Leakage Pathway
Back to Top
Government:
DCAM- DYS, Boston, MA
Facilities Maintenance Staffing Plan
Five Federal Buildings, New England
Facilities Management Operations and Maintenance
Pentagon Wedges 2-5, Department of Defense Washington, DC
Facilities condition assessment. Implemented Facilities Management Oversight
Back to Top
Healthcare & Hospitals
Beth Israel Deaconess Medical Center, Boston, MA
Assessment of Ventilation and Humidity Control Performance
Cooley Dickinson Hospital, Northampton, MA
Identification of Air Leakage Pathway
Emerson Hospital, Concord, MA
Work Management Business Practices & CMMS Needs Assessment
Glenview Nursing Home, Newton, MA
Maintenance and Operations
Lahey Clinic, Burlington, MA
Standard Operating Procedures for Joint Commission Compliance including CMMS Assessment
Large New England Hospitals
Boston, MA
Work Management Business Practices, Comparative Research & CMMS Needs Assessment
Maine Medical Center, Portland ME
Organizational Assessment of Grounds Operations
New York University Downtown Hospital, NY, NY
Facilities Condition Assessment
Whitehead Institute of Biomedical Research, Cambridge, MA
Construction management project
Back to Top
|
|
Higher Education:
Brigham & Women’s Hospital,
Boston, MA
Pneumatic system maintenance job aid
Georgetown University,
Washington D.C.
Customized facility reference documentation
Harvard Medical School, Boston, MA
Organizational Modeling, High Performance Contracting, Facilities Management Oversight
Harvard University, Cambridge, MA
Air Sealing Design Review, Construction Monitoring and Testing for LEED Prerequisite
Massachusetts Institute of Technology, Cambridge, MA
Organizational Evaluation of Central Plant Operations
Ashdown House Condition Assessment and Feasibility Study
Oberlin College, Oberlin, OH
Residential Master Planning - Facilities Condition Assessment
Penn State University, PA
Commissioning and CMMS Modeling - Pattee Library & Football Training Facility
Providence College, Providence, RI
Work Management Best Practices
Regis College, Weston, MA
Assessment of Indoor Air Quality Conditions
University of Massachusetts Amherst, Amherst, MA
Custodial Staffing Assessment
Yale Univ. School of Medicine,
New Haven, CT
Commissioning
Yale University, New Haven, CT
Personnel Job Descriptions
Capital Project Accounting Systems
Capital Budgeting Strategies
Back to Top
Life Sciences
Novartis Pharmaceutical Corporation, East Hanover, NJ
Assessment of Potential for Demand Controlled Ventilation
Phillips Medical Systems, Andover, MA
Organizational Evaluation and Quality Control Services
Back to Top
MANUFACTURING
The ACH Companies, Champaign, IL
Improved efficiency on jar filling & labeling line that eliminated seven production shifts per week
The Coca-Cola Company, Houston, TX
Design work for two international joint ventures (Chile and Venezuela) for filled container processing and packaging facilities
Confidential Client, Iowa
Improved efficiency on high-speed line; line efficiency was increased 9% or $2.4MM/year in finished goods.
Confidential Client, Kansas
Developed high speed carton line for specialty frozen food manufacturer
Confidential Client, Oregon
Completed packaging & hi-speed conveying equipment re-engineering; resulting in a 65% reduction in labor
Confidential Soft Drink Client,
Missouri & Pennsylvania
Engineered and installed hi-speed conveying, accumulating, and packing equipment to accept 2L or 3L beverage containers
Merck - MA & NJ
-
multiple locations in U.S
Designed process changes to move from batch to in-line processing and managed engineering operations
Welch Foods, Lawton, MI
Retooled high-speed single serve beverage line, from de-palletizing through acceptance of different container size
Back to Top
Public Use Facilities
Cleveland Museum of Art
Cleveland OH
Organizational Modeling and CMMS Support
Marriot International
Eastern United States
Retro-commissioning and Energy
New England Aquarium, Boston, MA
Facilities Services Operations and Maintenance
Back to Top |